Difference between revisions of "Yumessenin Bridge"
From HighestBridges.com
Jump to navigationJump to search (Created page with "<div style="font-size: 25px; text-align: center;"> Yumessenin Bridge<br /> 夢仙人大橋<br /> Higashinaruse, Akita, Japan<br /> (246) feet high / (75) meters high<br /> 361 fo...") |
|||
Line 6: | Line 6: | ||
361 foot span / 110 meter span<br /> | 361 foot span / 110 meter span<br /> | ||
2011<br /> | 2011<br /> | ||
− | [[File: | + | [[File:Sabgaw.jpg|750px|center]] |
</div> | </div> | ||
− | Yumessenin Bridge was completed in 2011 in anticipation of the completion of a large dam and reservoir in the mountains near the border of Akita, Iwate and Miyagi Prefectures. | + | Yumessenin Bridge was completed in 2011 in anticipation of the completion of a large dam and reservoir in the mountains near the border of Akita, Iwate and Miyagi Prefectures. The older section of route 342 was rerouted over the Yumessenin Bridge and into a 1.5 kilometer tunnel. |
− | [[File: | + | [[File:Sabogawa40mtSpan.jpg|750px|center]] |
− | [[File: | + | [[File:SabogaaVew.jpg|750px|center]] |
− | [[File: | + | [[File:AigawaCrsSection.jpg|750px|center]] |
− | [[File: | + | [[File:AigawaContuctionPattern.jpg|750px|center]] |
− | [[File: | + | [[File:CorrugatdDagram.jpg|750px|center]] |
− | [[File: | + | [[File:ExternaTndon.jpg|750px|center]] |
− | [[File: | + | [[File:CorrugaeDiagram.jpg|750px|center]] |
− | [[File: | + | [[File:ExternaTndon.jpg|750px|center]] |
− | [[File: | + | [[File:Sabogawatellite.jpg|750px|center]] |
Yumessenin Bridge satellite image. | Yumessenin Bridge satellite image. | ||
− | [[File: | + | [[File:AigawLoction.jpg|750px|center]] |
Yumessenin Bridge location map. | Yumessenin Bridge location map. | ||
− | [[File: | + | [[File:AigawLocaion.jpg|750px|center]] |
[[Category:Bridges in Japan]] | [[Category:Bridges in Japan]] |
Revision as of 05:34, 22 August 2020
Yumessenin Bridge
夢仙人大橋
Higashinaruse, Akita, Japan
(246) feet high / (75) meters high
361 foot span / 110 meter span
2011
Yumessenin Bridge was completed in 2011 in anticipation of the completion of a large dam and reservoir in the mountains near the border of Akita, Iwate and Miyagi Prefectures. The older section of route 342 was rerouted over the Yumessenin Bridge and into a 1.5 kilometer tunnel.
Yumessenin Bridge satellite image.
Yumessenin Bridge location map.